Delta IV Medium launch carrying DSCS III-B6
| |
Function | Orbital launch vehicle |
---|---|
Manufacturer | United Launch Alliance |
Country of origin | United States |
Cost per launch | US$164+ million |
Size | |
Height | 63–72 m (207–236 ft) |
Diameter | 5 m (16 ft) |
Mass | 249,500–733,400 kg (550,100–1,616,900 lb) |
Stages | 2 |
Capacity | |
Payload to LEO | 11,470–28,790 kg (25,290–63,470 lb) |
Payload to GTO | 4,440–14,220 kg (9,790–31,350 lb) |
Associated rockets | |
Family | Delta (rocket family) |
Comparable | |
Launch history | |
Status | Delta IV Heavy is active; Delta IV Medium, M+(4,2), M+(5,2), and M+(5,4) retired. |
Launch sites | SLC-37B, Cape Canaveral SLC-6, Vandenberg AFB |
Total launches |
40
|
Successes |
39
|
Partial failures | 1 (Heavy) |
First flight |
|
Last flight | |
Notable payloads | |
Boosters (Medium+) – GEM 60 | |
No. boosters | Medium+ (4,2), Medium+ (5,2): 2 Medium+ (5,4): 4 |
Gross mass | 33,638 kg (74,158 lb) |
Thrust | 826.6 kN (185,800 lbf) |
Specific impulse | 245 s (2.40 km/s) (sea level) |
Burn time | 91 seconds |
Fuel | HTPB / Aluminum |
Boosters (Heavy) – Common Booster Core (CBC) | |
No. boosters | 2 |
Gross mass | 226,400 kg (499,100 lb) |
Engines | 1 RS-68A |
Thrust | 3,140 kN (705,000 lbf) (sea level) |
Specific impulse | Sea level: 360 s (3.5 km/s) Vacuum: 412 s (4.04 km/s) |
Burn time | 242 seconds[2] |
Fuel | LH2 / LOX |
First stage – CBC | |
Gross mass | 226,400 kg (499,100 lb) |
Engines | 1 RS-68A |
Thrust | 3,140 kN (705,000 lbf) (sea level) |
Specific impulse | Sea level: 360 s (3.5 km/s) Vacuum: 412 s (4.04 km/s) |
Burn time | 245 seconds (328 seconds in Heavy configuration) |
Fuel | LH2 / LOX |
Second stage – Delta Cryogenic Second Stage (DCSS) | |
Gross mass | 4-m: 24,170 kg (53,290 lb) 5-m: 30,700 kg (67,700 lb) |
Engines | 1 RL10-B-2 |
Thrust | 110 kN (25,000 lbf) |
Specific impulse | 462 s (4.53 km/s) |
Burn time | 850-1,125 seconds |
Fuel | LH2 / LOX |
Delta IV is a group of five expendable launch systems in the Delta rocket family introduced in the early 2000s. Originally designed by Boeing's Defense, Space & Security division for the Evolved Expendable Launch Vehicle (EELV) program, the Delta IV became a United Launch Alliance (ULA) product in 2006. The Delta IV was and is primarily a launch vehicle for United States Air Force military payloads, but has also been used to launch a number of U.S. government non-military payloads and a single commercial satellite.
The Delta IV originally had two main versions which allowed the family to cover a range of payload sizes and masses: the retired Medium (which had four configurations) and Heavy. As of 2019, only the Heavy remains active, with payloads that would previously fly on Medium moving to either the existing Atlas V or the forthcoming Vulcan. Retirement of the Delta IV is anticipated in 2024.
Delta IV vehicles are built in the ULA facility in Decatur, Alabama. Final assembly is completed at the launch site by ULA: at the Horizontal Integration Facility for launches from SLC-37B pad at Cape Canaveral and in a similar facility for launches from SLC-6 pad at Vandenberg Air Force Base.
History
The latest evolutionary development of the Delta rocket family, Delta IV was introduced to meet the requirements of the United States Air Force's (USAF's) Evolved Expendable Launch Vehicle
(EELV, now national security space launch/NSSL) program. While the
Delta IV retains the name of the Delta family of rockets, major changes
were incorporated. Perhaps the most significant change was the switch
from kerosene to liquid hydrogen fuel, with new tankage and a new engine required.
During the Delta IV's development, a Small variant was considered. This would have featured the Delta II second stage, an optional Thiokol Star 48B third stage, and the Delta II payload fairing, all atop a single Common Booster Core (CBC). The Small variant was dropped by 1999.
In 2002, the Delta IV was first launched, with the RS-68 becoming the first large liquid-propellant rocket engine designed in the U.S. since the Space Shuttle main engine (SSME) in the 1970s. The primary goal for the RS-68 was to reduce cost versus the SSME. Some sacrifice in chamber pressure and specific impulse
was made, hurting efficiency; however, development time, part count,
total cost, and assembly labor were reduced to a fraction of the SSME,
despite the RS-68's significantly larger size.
The L3 Technologies
Redundant Inertial Flight Control Assembly (RIFCA) guidance system
originally used on the Delta IV was common to that carried on the Delta II, although the software was different because of the differences between the Delta II and Delta IV. The RIFCA featured six ring laser gyroscopes and accelerometers each, to provide a higher degree of reliability.
Boeing
initially intended to market Delta IV commercial launch services.
However, the Delta IV entered the space launch market when global
capacity was already much higher than demand. Furthermore, as an
unproven design it had difficulty finding a market in commercial
launches, and Delta IV launch costs are higher than comparable vehicles
of the same era. In 2003, Boeing pulled the Delta IV from the commercial
market, citing low demand and high costs. In 2005, Boeing stated that
it sought to return the Delta IV to commercial service.
As of 2009, the USAF funded Delta IV EELV engineering,
integration, and infrastructure work through contracts with Boeing
Launch Services (BLS). On August 8, 2008, the USAF Space and Missile Systems Center
increased the "cost plus award fee" contract with BLS for $1.656
billion to extend the period of performance through the end of FY09. In addition a $557.1 million option was added to cover FY10. However, the Delta IV series was at that time launched by the United Launch Alliance (ULA), a joint venture between Boeing and Lockheed Martin.
In February 2010, naturalized citizen Dongfan Chung, an engineer working with Boeing, was the first person convicted under the Economic Espionage Act of 1996. Chung passed on classified information on designs including the Delta IV rocket and was sentenced to 15 years.
In March 2015, ULA announced plans to phase out the Delta IV Medium by 2018. The Delta IV will be replaced by the Atlas V in the near term and Vulcan in the far term. The Delta IV Medium was actually retired on 22 August 2019.
With the exception of the first launch, which carried the Eutelsat W5 commercial communications satellite, all Delta IV launches have been paid for by the US government. In 2015, ULA stated that a Delta IV Heavy is sold for nearly $400 million.
RS-68A booster engine upgrade
The
possibility of a higher performance Delta IV was first proposed in a
2006 RAND Corporation study of national security launch requirements out
to 2020. A single National Reconnaissance Office (NRO) payload required an increase in the lift capability of the Delta IV Heavy. Lift capacity was increased by developing the higher-performance RS-68A engine, which first flew on June 29, 2012.
ULA phased out the baseline RS-68 engine with the launch of Delta
flight 371 on March 25, 2015. All following launches have used the
RS-68A,
and the engine's higher thrust allowed the use of a single standardized
CBC design for all Delta IV Medium and M+ versions. This upgrade
reduced cost and increased flexibility, since any standardized CBC could
be configured for zero, two, or four solid boosters. However, the new
CBC led to a slight performance loss for most medium configurations. The Delta IV Heavy still requires non-standard CBCs for the core and boosters.
Payload capacities after RS-68A upgrade
Version | Fairing | CBCs | SRBs | Payload to LEO
407 km x 51.6°
|
Payload to GTO
1800 m/s residual
|
Launches to date |
---|---|---|---|---|---|---|
Medium | 4 m | 1 | 0 | 8,510 kg | 4,440 kg | 0 |
M+(4,2) | 4 m | 1 | 2 | 12,000 kg | 6,390 kg | 2 |
M+(5,2) | 5 m | 1 | 2 | 10,220 kg | 5,490 kg | 2 |
M+(5,4) | 5 m | 1 | 4 | 12,820 kg | 7,300 kg | 4 |
Heavy | 5 m | 3 | 0 | 25,980 kg | 14,220 kg | 4 |
Payload capacities with original RS-68
Version
|
Fairing
|
CBCs
|
SRBs
|
Payload to LEO
407 km x 51.6° |
Payload to GTO
1800 m/s residual |
Launches to date
|
---|---|---|---|---|---|---|
Medium | 4 m | 1 | 0 | 8,800 kg | 4,540 kg | 3 |
M+(4,2) | 4 m | 1 | 2 | 11,920 kg | 6,270 kg | 13 |
M+(5,2) | 5 m | 1 | 2 | 10,580 kg | 5,430 kg | 1 |
M+(5,4) | 5 m | 1 | 4 | 13,450 kg | 7,430 kg | 4 |
Heavy | 5 m | 3 | 0 | 22,980 kg | 13,400 kg | 7 |
Proposed upgrades that were not implemented
Possible
future upgrades for the Delta IV included adding extra strap-on solid
motors, higher-thrust main engines, lighter materials, higher-thrust
second stages, more (up to six) strap-on CBCs, and a cryogenic
propellant cross feed from strap on boosters to the common core.
At one point NASA planned to use Delta IV or Atlas V to launch the proposed Orbital Space Plane, which eventually became the Crew Exploration Vehicle and then the Orion. Orion was intended to fly on the Ares I launch vehicle, then the Space Launch System after Ares I was cancelled.
In 2009 The Aerospace Corporation reported on NASA results of a study to determine the feasibility of modifying Delta IV to be human-rated for use in NASA human spaceflight missions. According to Aviation Week the study, "found that a Delta IV heavy [...] could meet NASA's requirements for getting humans to low Earth orbit."
A proposed upgrade to the Delta IV family was the addition of
extra solid motors. The Medium+(4,4) would have used existing mount
points to pair the four GEM-60s of the M+(5,4) with the upper stage and
fairing of the (4,2). An M+(4,4) would have had a GTO payload of
7,500 kg (16,600 lb), a LEO payload of 14,800 kg (32,700 lb), and could
have been available within 36 months of the first order. It was also
considered to add extra GEM-60s to the M+(5,4), which would have
required adding extra attachment points, structural changes to cope with
the different flight loads, and launch pad and infrastructure changes.
The Medium+(5,6) and (5,8) would have flown with six and eight SRBs
respectively, for a maximum of up to 9,200 kg/20,200 lb to GTO with the
M+(5,8). The Medium+(5,6) and (5,8) could have been available within 48
months of the first order.
Planned successor
The Vulcan rocket is planned to replace the Atlas V and Delta IV rockets. Vulcan is projected to enter service by 2021, using the Blue Origin BE-4 methane-fueled rocket engine.
The Delta IV Heavy and Atlas V are expected to stay in service for a
few years after Vulcan's inaugural launch, and the Heavy is expected to
be discontinued by 2024.
Vehicle description
Delta IV Medium
The Delta IV Medium was available in four configurations: Medium, Medium+ (4,2), Medium+ (5,2), and Medium+ (5,4).
The Delta IV Medium (Delta 9040) was the most basic Delta IV. It
featured a single CBC and a modified Delta III second stage, with
4-meter liquid hydrogen and liquid oxygen tanks and a 4-meter payload
fairing. The Delta IV Medium was capable of launching 4,200 kg to geosynchronous transfer orbit
(GTO). From Cape Canaveral, GTO is 1804 m/s away from GEO. The mass of
fairing and payload attach fittings have been subtracted from the gross
performance. It flew last time on 22 August 2019.
The Delta IV Medium+ (4,2) (Delta 9240) had the same CBC and DCSS as the Medium, but with the addition of two Orbital ATK-built 1.5-m (60-in) diameter solid rocket booster Graphite-Epoxy Motors (GEM-60s) strap-on boosters to increase payload capacity to 6,150 kg to GTO.
The Delta IV Medium+ (5,2) (Delta 9250) was similar to the
Medium+ (4,2), but had a 5-m–diameter DCSS and payload fairing for
larger payloads. Because of the extra weight of the larger payload
fairing and second stage, the Medium+ (5,2) could launch 5,072 kg to
GTO.
The Delta IV Medium+ (5,4) (Delta 9450) was similar to the
Medium+ (5,2), but used four GEM-60s instead of two, enabling it to lift
6,882 kg to GTO.
To encapsulate the satellite payload, a variety of different
payload fairings were available. A stretched Delta III 4 meter diameter
composite payload fairing was used on 4 meter Medium versions, while an
enlarged, 5 meter diameter composite fairing was used on 5 meter Medium
versions.
Delta IV Heavy
The Delta IV Heavy (Delta 9250H) combines a 5-meter (16 ft) diameter
DCSS and payload fairing with two additional CBCs. These are strap-on
boosters which are separated
earlier in the flight than the center CBC. As of 2007, a longer 5 meter
diameter composite fairing was standard on the Delta IV Heavy,
with an aluminum isogrid fairing also available. The aluminum trisector
(three-part) fairing was built by Boeing and derived from a Titan IV fairing. The trisector fairing was first used on the DSP-23 flight. The Delta IV with the extended fairing is over 62 m (205 ft) tall.
Common Booster Core
Each Delta IV consists of at least one Common Booster Core (CBC). Each CBC is powered by one Aerojet Rocketdyne RS-68 engine, which burns liquid hydrogen and liquid oxygen.
On flights of the Medium, the RS-68 ran at 102% rated thrust for
the first few minutes of flight, and then throttled down to 58% rated
thrust before main engine cutoff.
On the Heavy, the main CBC's engine throttles down to 58% rated thrust
around 50 seconds after liftoff, while the strap-on CBCs remain at 102%.
This conserves propellant and allows the main CBC to burn after booster
separation. After the strap-on CBCs separate, the main CBC's engine throttles back up to 102% before throttling back down to 58% prior to main engine cutoff.
The RS-68 engine is mounted to the lower thrust structure of the CBC by a four-legged (quadrapod) thrust frame and enclosed in a protective composite conical thermal shield. Above the thrust structure is an aluminum isogrid (a grid pattern machined out of the inside of the tank to reduce weight) liquid hydrogen tank, followed by a composite
cylinder called the centerbody, an aluminum isogrid liquid oxygen tank,
and a forward skirt. Along the back of the CBC is a cable tunnel to
hold electrical and signal lines, and a feedline to carry the liquid
oxygen to the RS-68 from the tank. The CBC is of a constant, 5-meter
(16.4 ft) diameter.
Delta Cryogenic Second Stage
The upper stage of the Delta IV is the Delta Cryogenic Second Stage (DCSS). The DCSS is based on the Delta III
upper stage but has increased propellant capacity. Two versions have
been produced: a 4-meter (13.1 ft) diameter DCSS that was retired with
the Delta IV Medium and a 5-meter diameter DCSS that remains in service
with the Delta IV Heavy. The 4 m diameter version lengthened both Delta
III propellant tanks, while the 5-meter version has an extended diameter
liquid hydrogen tank and a further lengthened liquid oxygen tank.
Regardless of the diameter, each DCSS is powered by one RL10B2 engine, with an extendable carbon-carbon nozzle to improve specific impulse.
Two different interstages are used to mate the first stage and DCSS. A
tapering interstage that narrowed down from 5 m to 4 m diameter was used
to mate the 4 m DCSS to the CBC, while a cylindrical interstage is used
to mate the 5 m DCSS. Both interstages were built from composites and
enclosed the liquid oxygen tank, with the larger liquid hydrogen tank
making up part of the vehicle's outer mold line.
Launch sites
Delta IV launches occur from either of two rocket launch complexes. Launches on the East coast of the United States use Space Launch Complex 37 (SLC-37) at the Cape Canaveral Air Force Station. On the West coast, polar-orbit and high-inclination launches use Vandenberg Air Force Base's Space Launch Complex 6 (SLC-6).
Launch facilities at both sites are similar. A Horizontal Integration Facility
(HIF) is situated some distance from the pad. Delta IV CBCs and second
stages to be mated and tested in the HIF before they are moved to the
pad. The partial horizontal rocket assembly of the Delta IV is somewhat similar to the Soyuz launch vehicle, which is completely assembled horizontally. The Space Shuttles, the past Saturn launch vehicles, and the upcoming Space Launch System are assembled and rolled out to the launch pad entirely vertically.
Movement of the Delta IVs among the various facilities at the pad
is facilitated by rubber-tired Elevating Platform Transporters (EPTs)
and various transport jigs. Diesel engine
EPTs are used for moving the vehicles from the HIF to the pad, while
electric EPTs are used in the HIF, where precision of movement is
important.
The basic launchpad structure includes a flame trench to direct
the engine plume away from the rocket, lightning protection, and
propellant storage. In the case of Delta IV, the vehicle is completed on
the launch pad inside a building. This Mobile Service Tower (MST)
provides service access to the rocket and protection from the weather
and is rolled away from the rocket on launch day. A crane at the top of
the MST lifts the encapsulated payload to the vehicle and also attached
the GEM-60 solid motors for Delta IV Medium launches. The MST is rolled
away from the rocket several hours before launch. At Vandenberg, the
launch pad also has a Mobile Assembly Shelter (MAS), which completely
encloses the vehicle; at CCAFS, the vehicle is partly exposed near its
bottom.
Beside the vehicle is a Fixed Umbilical Tower (FUT), which has
two (VAFB) or three (CCAFS) swing arms. These arms carry telemetry
signals, electrical power, hydraulic
fluid, environmental control air flow, and other support functions to
the vehicle through umbilical lines. The swing arms retract at T-0
seconds once the vehicle is committed to launch.
Under the vehicle is a Launch Table, with six Tail Service Masts
(TSMs), two for each CBC. The Launch Table supports the vehicle on the
pad, and the TSMs provide further support and fueling functions for the
CBCs. The vehicle is mounted to the Launch Table by a Launch Mate Unit
(LMU), which is attached to the vehicle by bolts that sever at launch.
Behind the Launch Table is a Fixed Pad Erector (FPE), which uses two
long-stroke hydraulic pistons to raise the vehicle to the vertical
position after being rolled to the pad from the Horizontal Integration
Facility (HIF). Beneath the Launch Table is a flame duct, which deflects
the rocket's exhaust away from the rocket or facilities.
Vehicle processing
Delta IV CBCs and DCSSs are assembled at ULA's factory in Decatur, Alabama. They are then loaded onto the M/V Delta Mariner, a roll-on/roll-off cargo vessel, and shipped to either launch pad. There, they are offloaded and rolled into a Horizontal Integration Facility
(HIF). For Delta IV Medium launches, the CBC and DCSS were mated in the
HIF. For Delta IV Heavy launches, the port and starboard strap-on CBCs
are also mated in the HIF.
Various tests are performed, and then the vehicle is rolled
horizontally to the pad, where the Fixed Pad Erector (FPE) is used to
raise the vehicle to the vertical position. At this time, the GEM-60
solid motors, if any are required, are rolled to the pad and attached to
the vehicle. After further testing, the payload (which has already been
enclosed in its fairing) is transported to the pad, hoisted into the
MST by a crane, and attached to the vehicle. Finally, on launch day, the
MST is rolled away from the vehicle, and the vehicle is ready for
launch.
Notable launches
The first payload launched with a Delta IV was the Eutelsat W5 communications satellite. A Medium+ (4,2) from Cape Canaveral carried the communications satellite into geostationary transfer orbit (GTO) on 20 November 2002.
Heavy Demo was the first launch of the Delta IV Heavy in December 2004 after significant delays due to bad weather. Due to cavitation
in the propellant lines, sensors on all three CBCs registered depletion
of propellant. The strap-on CBCs and then core CBC engines shut down
prematurely, even though sufficient propellant remained to continue the
burn as scheduled. The second stage attempted to compensate for the
shutdown and burned until it ran out of propellant. This flight was a
test launch carrying a payload of:
- DemoSat – 6020 kg; an aluminum cylinder filled with 60 brass rods – planned to be carried to GEO; however due to the sensor faults, the satellite did not reach this orbit.
- NanoSat-2, carried to low Earth orbit (LEO) – a set of two very small satellites of 24 and 21 kg, nicknamed Sparky and Ralphie – planned to orbit for one day. Given the under-burn, the two most likely did not reach a stable orbit.
NROL-22 was the first Delta IV launched from SLC-6 at
Vandenberg Air Force Base (VAFB). It was launched aboard a Medium+ (4,2)
in June 2006 carrying a classified satellite for the U.S. National Reconnaissance Office (NRO).
DSP-23 was the first launch of a valuable payload aboard a Delta IV Heavy. This was also the first Delta IV launch contracted by the United Launch Alliance, a joint venture between Boeing and Lockheed Martin. The main payload was the 23rd and final Defense Support Program missile-warning satellite, DSP-23. Launch from Cape Canaveral occurred on November 10, 2007.
NROL-26 was the first Delta IV Heavy EELV launch for the NRO. USA 202, a classified reconnaissance satellite, lifted off 18 January 2009.
NROL-32
was a Delta IV Heavy launch, carrying a satellite for NRO. The payload
is speculated to be the largest satellite sent into space. After a delay
from 19 October 2010, the rocket lifted off on 21 November 2010.
NROL-49 lifted off from Vandenberg AFB on January 20, 2011.
It was the first Delta IV Heavy mission to be launched out of
Vandenberg. This mission was for the NRO and its details are classified.
On October 4, 2012, a Delta IV M+ (4,2) experienced an anomaly in
the upper stage's RL10-B-2 engine which resulted in lower than expected
thrust. While the vehicle had sufficient fuel margins to successfully
place the payload, a GPS Block IIF satellite, into its targeted orbit,
investigation into the glitch delayed subsequent Delta IV launches and
the next Atlas V launch (AV-034) due to commonality between the engines
used on both vehicles' upper stages.
By December 2012, ULA had determined the cause of the anomaly to be a
fuel leak, and Delta IV launches resumed in May 2013. After two more
successful launches, further investigation led to the delay of Delta
flight 365 with the GPS IIF-5 satellite. Originally scheduled to launch in October 2013, the vehicle lifted off on February 21, 2014.
A Delta IV Heavy launched the Orion spacecraft on an uncrewed test flight, EFT-1, on December 5, 2014.
The launch was originally planned for December 4, but high winds and
valve issues caused the launch to be rescheduled for December 5.
The second GPS Block III satellite was launched with the final Delta IV Medium in the +(4,2) configuration on 22 August 2019.