Since about 2001 the term nuclear renaissance has been used to refer to a possible nuclear power industry revival, driven by rising fossil fuel prices and new concerns about meeting greenhouse gas emission limits.
In the 2009 World Energy Outlook, the International Energy Agency stated that:
A nuclear renaissance is possible but cannot occur overnight. Nuclear projects face significant hurdles, including extended construction periods and related risks, long licensing processes and manpower shortages, plus long‐standing issues related to waste disposal, proliferation and local opposition. The financing of new nuclear power plants, especially in liberalized markets, has always been difficult and the financial crisis seems almost certain to have made it even more so. The huge capital requirements, combined with risks of cost overruns and regulatory uncertainties, make investors and lenders very cautious, even when demand growth is robust.
The World Nuclear Association reported that nuclear electricity generation in 2012 was at its lowest level since 1999.
In 2015:
- Ten new reactors were connected to the grid, the highest number since 1990, but expanding Asian nuclear programs are balanced by retirements of aging plants and nuclear reactor phase-outs.
- Seven reactors were permanently shut down.
- 441 operational reactors had a worldwide net capacity of 382,855 megawatts of electricity. However, some reactors are classified as operational, but are not producing any power.
- 67 new nuclear reactors were under construction, including four EPR units. The first two EPR projects, in Finland and France, were meant to lead a nuclear renaissance but both are facing costly construction delays. Construction commenced on two Chinese EPR units in 2009 and 2010. The Chinese units were to start operation in 2014 and 2015, but the Chinese government halted construction because of safety concerns.
March 2017 saw a setback for nuclear renaissance when producer of the AP1000 reactor Westinghouse Electric Company filed for Chapter 11 bankruptcy protection.
Four months later the bankruptcy together with delays and cost overruns
caused cancellation of the two AP1000 reactors under construction at
the Virgil C. Summer Nuclear Generating Station.
History
In 2009
annual generation of nuclear power has been on a slight downward trend
since 2007, decreasing 1.8% in 2009 to 2558 TWh with nuclear power
meeting 13–14% of the world's electricity demand. A major factor in the decrease has been the prolonged repair of seven large reactors at the Kashiwazaki-Kariwa Nuclear Power Plant in Japan following the Niigata-Chuetsu-Oki earthquake.
In March 2011 the nuclear accidents at Japan's Fukushima I Nuclear Power Plant and shutdowns at other nuclear facilities raised questions among some commentators over the future of the renaissance. Platts
has reported that "the crisis at Japan's Fukushima nuclear plants has
prompted leading energy-consuming countries to review the safety of
their existing reactors and cast doubt on the speed and scale of planned
expansions around the world". In 2011 Siemens exited the nuclear power sector following the Fukushima disaster and subsequent changes to German energy policy, and supported the German government's planned energy transition to renewable energy technologies. China, Germany, Switzerland, Israel, Malaysia, Thailand, United Kingdom, Italy and the Philippines have reviewed their nuclear power programs. Indonesia and Vietnam still plan to build nuclear power plants. Countries such as Australia, Austria, Denmark, Greece, Ireland, Latvia, Liechtenstein, Luxembourg, Portugal, Israel, Malaysia, New Zealand, and Norway remain opposed to nuclear power. Following the Fukushima I nuclear accidents, the International Energy Agency halved its estimate of additional nuclear generating capacity built by 2035.
The World Nuclear Association
has reported that “nuclear power generation suffered its biggest ever
one-year fall through 2012 as the bulk of the Japanese fleet remained
offline for a full calendar year”. Data from the International Atomic Energy Agency
showed that nuclear power plants globally produced 2346 TWh of
electricity in 2012 – seven per cent less than in 2011. The figures
illustrate the effects of a full year of 48 Japanese power reactors
producing no power during the year. The permanent closure of eight
reactor units in Germany was also a factor. Problems at Crystal River,
Fort Calhoun and the two San Onofre units in the USA meant they produced
no power for the full year, while in Belgium Doel 3 and Tihange 2 were
out of action for six months. Compared to 2010, the nuclear industry
produced 11% less electricity in 2012.
As of July 2013, "a total of 437 nuclear reactors were operating
in 30 countries, seven fewer than the historical maximum of 444 in 2002.
Since 2002, utilities have started up 28 units and disconnected 36
including six units at the Fukushima Daiichi nuclear power plant in
Japan. The 2010 world reactor fleet had a total nominal capacity of
about 370 gigawatts (or thousand megawatts). Despite seven fewer units
operating in 2013 than in 2002, the capacity is still about 7 gigawatts
higher".
Overview
A total of 72 reactors were under construction at the beginning of 2014, the highest number in 25 years.
Several of the under construction reactors are carry over from earlier
eras; some are partially completed reactors on which work has resumed
(e.g., in Argentina); some are small and experimental (e.g., Russian floating reactors); and some have been on the IAEA’s “under construction” list for years (e.g., in India and Russia).
Reactor projects in Eastern Europe are essentially replacing old Soviet
reactors shut down due to safety concerns. Most of the 2010 activity ―
30 reactors ― is taking place in four countries: China, India, Russia
and South Korea. Turkey, the United Arab Emirates and Iran are the only
countries that are currently building their first power reactors, Iran's
construction began decades ago.
Various barriers to a nuclear renaissance have been suggested. These
include: unfavorable economics compared to other sources of energy, slowness in addressing climate change, industrial bottlenecks and personnel shortages in the nuclear sector, and the contentious issue of what to do with nuclear waste or spent nuclear fuel. There are also concerns about more nuclear accidents, security, and nuclear weapons proliferation.
New reactors under construction in Finland and France, which were meant to lead a nuclear renaissance, have been delayed and are running over-budget. China has 22 new reactors under construction,
and there are also a considerable number of new reactors being built in
South Korea, India, and Russia. At the same time, at least 100 older
and smaller reactors will "most probably be closed over the next 10–15
years". So the expanding nuclear programs in Asia are balanced by retirements of aging plants and nuclear reactor phase-outs.
A study by UBS,
reported on April 12, 2011, predicts that around 30 nuclear plants may
be closed worldwide, with those located in seismic zones or close to
national boundaries being the most likely to shut. The analysts believe that 'even pro-nuclear countries such as France
will be forced to close at least two reactors to demonstrate political
action and restore the public acceptability of nuclear power', noting
that the events at Fukushima 'cast doubt on the idea that even an
advanced economy can master nuclear safety'. In September 2011, German engineering giant Siemens announced it will withdraw entirely from the nuclear industry, as a response to the Fukushima nuclear disaster in Japan.
The 2011 World Energy Outlook report by the International Energy Agency
stated that having "second thoughts on nuclear would have far-reaching
consequences" and that a substantial shift away from nuclear power would
boost demand for fossil fuels, putting additional upward pressure on
the price of energy, raising additional concerns about energy security,
and making it more difficult and expensive to combat climate change.
The reports suggests that the consequences would be most severe for
nations with limited local energy resources and which have been planning
to rely heavily on nuclear power for future energy security, and that
it would make it substantially more challenging for developing economies
to satisfy their rapidly increasing demand for electricity.
John Rowe, chair of Exelon
(the largest nuclear power producer in the US), has said that the
nuclear renaissance is "dead". He says that solar, wind and cheap
natural gas have significantly reduced the prospects of coal and nuclear
power plants around the world. Amory Lovins says that the sharp and steady cost reductions in solar power has been a "stunning market success".
In 2013 the analysts at the investment research firm Morningstar, Inc. concluded that nuclear power was not a viable source of new power in the West. On nuclear renaissance they wrote:
The economies of scale experienced in France during its initial build-out and the related strength of supply chain and labor pool were imagined by the dreamers who have coined the term ‘nuclear renaissance’ for the rest of the world. But outside of China and possibly South Korea this concept seems a fantasy, as should become clearer examining even theoretical projections for new nuclear build today.
Economics
Nuclear power plants are large construction projects with very high
up-front costs. The cost of capital is also steep due to the risk of
construction delays and obstructing legal action.
The large capital cost of nuclear power has been a key barrier to the
construction of new reactors around the world, and the economics have
recently worsened, as a result of the global financial crisis.
As the OECD’s Nuclear Energy Agency points out, "investors tend to
favor less capital intensive and more flexible technologies". This has led to a large increase in the use of natural gas for base-load power production, often using more sophisticated combined cycle plants.
Accidents and safety
Major nuclear reactor accidents include Three Mile Island accident (1979), Chernobyl disaster (1986), and Fukushima (2011). A report in Lancet says that the effects of these accidents on individuals and societies are diverse and enduring. Relatively few immediate deaths have occurred, but nuclear-related fatalities are mostly in the hazardous uranium mining industry, which supplies fuel to nuclear reactors.
There are also physical health problems directly attributable to
radiation exposure, as well as psychological and social effects. The Fukushima accident
forced more than 80,000 residents to evacuate from neighborhoods around
the crippled nuclear plant. Evacuation and long-term displacement
create severe health-care problems for the most vulnerable people, such
as hospital inpatients and elderly people.
Charles Perrow, in his book Normal accidents
says that multiple and unexpected failures are built into complex and
tightly-coupled systems, such as nuclear power plants. Such accidents
often involve operator error and are unavoidable and cannot be designed
around. Since the terrorist attacks of September 11, 2001,
there has been heightened concern that nuclear power plants may be
targeted by terrorists or criminals, and that nuclear materials may be
purloined for use in nuclear or radiological weapons.
Nevertheless, newer reactor designs intended to provide increased safety have been developed over time. The next nuclear plants to be built will likely be Generation III or III+ designs, and a few are being built in Japan.
However, safety risks may be the greatest when nuclear systems are the
newest, and operators have less experience with them. Nuclear engineer David Lochbaum
explained that almost all serious nuclear accidents occurred with what
was at the time the most recent technology. He argues that "the problem
with new reactors and accidents is twofold: scenarios arise that are
impossible to plan for in simulations; and humans make mistakes".
Controversy
A nuclear power controversy has surrounded the deployment and use of nuclear fission reactors to generate electricity from nuclear fuel
for civilian purposes. The controversy peaked during the 1970s and
1980s, when it "reached an intensity unprecedented in the history of
technology controversies", in some countries.
In 2008 there were reports of a revival of the anti-nuclear movement in Germany and protests in France during 2004 and 2007. Also in 2008 in the United States, there were protests about, and criticism of, several new nuclear reactor proposals and later some objections to license renewals for existing nuclear plants.
Public opinion
In 2005, the International Atomic Energy Agency presented the results of a series of public opinion surveys in the Global Public Opinion on Nuclear Issues report. Majorities of respondents in 14 of the 18 countries surveyed believe that the risk of terrorist acts involving radioactive materials
at nuclear facilities is high, because of insufficient protection.
While majorities of citizens generally support the continued use of
existing nuclear power reactors, most people do not favour the building
of new nuclear plants, and 25% of respondents feel that all nuclear
power plants should be closed down. Stressing the climate change
benefits of nuclear energy positively influences 10% of people to be
more supportive of expanding the role of nuclear power in the world, but
there is still a general reluctance to support the building of more
nuclear power plants.
After the Fukushima Disaster, Civil Society Institute (CSI) found out
that 58 percent of the respondents indicated less support of using
nuclear power in the United States. Two-thirds of the respondents said
they would protest the construction of a nuclear reactor within 50 miles
of their homes.
There was little support across the world for building new
nuclear reactors, a 2011 poll for the BBC indicates. The global research
agency GlobeScan, commissioned by BBC News, polled 23,231 people in 23 countries from July to September 2011, several months after the Fukushima nuclear disaster.
In countries with existing nuclear programmes, people are significantly
more opposed than they were in 2005, with only the UK and US bucking
the trend. Most believe that boosting energy efficiency and renewable energy can meet their needs.
By region and country
Africa
As of March 2010, ten African nations had begun exploring plans to build nuclear reactors.
South Africa (which has two nuclear power reactors), however, removed government funding for its planned new PBMRs in 2010.
America
Between 2007 and 2009, 13 companies applied to the Nuclear Regulatory Commission for construction and operating licenses to build 30 new nuclear power reactors in the United States.
However, the case for widespread nuclear plant construction was eroded
due to abundant natural gas supplies, slow electricity demand growth in a
weak US economy, lack of financing, and uncertainty following the Fukushima nuclear disaster. Many license applications for proposed new reactors were suspended or cancelled. Only a few new reactors will enter service by 2020.
These will not be the cheapest energy options available, but they are
an attractive investment for utilities because the government mandates
that taxpayers pay for construction in advance. In 2013, four aging, uncompetitive, reactors were permanently closed: San Onofre 2 and 3 in California, Crystal River 3 in Florida, and Kewaunee in Wisconsin. Vermont Yankee, in Vernon, is scheduled to close in 2014, following many protests. New York State is seeking to close Indian Point Energy Center, in Buchanan, 30 miles from New York City.
Neither climate change
abatement, nor the Obama Administration’s endorsement of nuclear power
with $18.5 billion in loan guarantees, have been able to propel nuclear
power in the US past existing obstacles. The Fukushima nuclear disaster hasn’t helped either.
As of 2014, the U.S. nuclear industry began a new lobbying effort, hiring three former senators — Evan Bayh, a Democrat; Judd Gregg, a Republican; and Spencer Abraham, a Republican — as well as William M. Daley,
a former staffer to President Obama. The initiative is called Nuclear
Matters, and it has begun a newspaper advertising campaign.
Locations of new US reactors and their scheduled operating dates are:
- Tennessee, Watts Bar unit 2 in operation 2016
- Georgia, Vogtle Electric unit 3 operational 2019 and unit 4 operational 2020
- South Carolina, Virgil C Summer unit 2 operational 2019 and unit 3 operational 2020
On 29 March 2017, parent company Toshiba placed Westinghouse Electric Company in Chapter 11 bankruptcy
because of US$9 billion of losses from its nuclear reactor construction
projects. The projects responsible for this loss are mostly the
construction of four AP1000 reactors at Vogtle in Georgia and V. C. Summer in South Carolina.
The U.S. government had given $8.3 billion of loan guarantees on the
financing of the four nuclear reactors being built in the U.S., and it
is expected a way forward to completing the plant can be agreed. Peter A. Bradford, former U.S. Nuclear Regulatory Commission member, commented "They placed a big bet on this hallucination of a nuclear renaissance".
Asia
As of 2008, the greatest growth in nuclear generation was expected to be in China, Japan, South Korea and India.
As of early 2013 China
had 17 nuclear reactors operating and 32 under construction, with more
planned. "China is rapidly becoming self-sufficient in reactor design
and construction, as well as other aspects of the fuel cycle."
However, according to a government research unit, China must not build
"too many nuclear power reactors too quickly", in order to avoid a
shortfall of fuel, equipment and qualified plant workers.
Following the Fukushima disaster, many are questioning the mass
roll-out of new plants in India, including the World Bank, the Indian
Environment Minister, Jairam Ramesh, and the former head of the
country's nuclear regulatory body, A. Gopalakrishnan. The massive Jaitapur Nuclear Power Project
is the focus of concern – "931 hectares of farmland will be needed to
build the reactors, land that is now home to 10,000 people, their mango
orchards, cashew trees and rice fields". Fishermen in the region say
their livelihoods will be wiped out.
South Korea is exploring nuclear projects with a number of nations.
Australia
Australia is a major producer of uranium, which it exports as uranium oxide to nuclear power generating nations. Australia has a single research reactor at Lucas Heights,
but does not generate electricity via nuclear power. As of 2015, the
majority of the nation's uranium mines are in South Australia, where a Nuclear Fuel Cycle Royal Commission is investigating the opportunities and costs of expanding the state's role in the nuclear fuel cycle.
As of January 2016, new nuclear industrial development (other than the
mining of uranium) is prohibited by various acts of federal and state
legislation. The Federal government will consider the findings of the
South Australian Royal Commission after it releases its findings in
2016.
Canada
With several CANDU reactors facing closure selected plants will be completely refurbished between 2016 and 2026, extending their operation beyond 2050.
Europe
On 18 October 2010 the British government announced eight locations it considered suitable for future nuclear power stations.
This has resulted in public opposition and protests at some of the
sites. In March 2012, two of the big six power companies announced they
would be pulling out of developing new nuclear power plants. The decision by RWE npower and E.ON follows uncertainty over nuclear energy following the Fukushima nuclear disaster last year.
The companies will not proceed with their Horizon project, which was to
develop nuclear reactors at Wylfa in North Wales and at
Oldbury-on-Severn in Gloucestershire.
Their decision follows a similar announcement by Scottish and Southern
Electricity last year. Analysts said the decision meant the future of UK
nuclear power could now be in doubt.
The 2011 Japanese Fukushima nuclear disaster has led some European energy officials to "think twice about nuclear expansion". Switzerland has abandoned plans to replace its old nuclear reactors and will take the last one offline in 2034. Anti-nuclear opposition intensified in Germany. In the following months the government decided to shut down eight reactors immediately (August 6, 2011) and to have the other nine off the grid by the end of 2022. Renewable energy in Germany
is believed to be able to compensate for much of the loss. In September
2011 Siemens, which had been responsible for constructing all 17 of
Germany's existing nuclear power plants, announced that it would exit
the nuclear sector
following the Fukushima disaster and the subsequent changes to German
energy policy. Chief executive Peter Loescher has supported the German
government's planned energy transition
to renewable energy technologies, calling it a "project of the century"
and saying Berlin's target of reaching 35% renewable energy sources by
2020 was feasible.
On October 21, 2013, EDF Energy announced that an agreement had
been reached regarding new nuclear plants to be built on the site of Hinkley Point C.
EDF Group and the UK Government agreed on the key commercial terms of
the investment contract. The final investment decision is still
conditional on completion of the remaining key steps, including the
agreement of the EU Commission.
In February 2014, Amory Lovins commented that:
Britain's plan for a fleet of new nuclear power stations is … unbelievable ... It is economically daft. The guaranteed price [being offered to French state company EDF] is over seven times the unsubsidized price of new wind in the US, four or five times the unsubsidized price of new solar power in the US. Nuclear prices only go up. Renewable energy prices come down. There is absolutely no business case for nuclear. The British policy has nothing to do with economic or any other rational base for decision making.
Middle East
In December 2009 South Korea won a contract for four nuclear power plants to be built in the United Arab Emirates, for operation in 2017 to 2020.
On March 17, 2011, Israeli Prime Minister Benjamin Netanyahu stated that Israel was now unlikely to pursue civil nuclear energy.
Russia
In April 2010 Russia announced new plans to start building 10 new nuclear reactors in the next year.
Views and opinions
In June 2009, Mark Cooper from the Vermont Law School
said: "The highly touted renaissance of nuclear power is based on
fiction, not fact... There are numerous options available to meet the
need for electricity in a carbon-constrained environment that are
superior to building nuclear reactors".
In September 2009, Luc Oursel, chief executive of Areva Nuclear Plants (the core nuclear reactor manufacturing division of Areva)
stated: "We are convinced about the nuclear renaissance". Areva has
been hiring up to 1,000 people a month, "to prepare for a surge in
orders from around the world". However, in June 2010, Standard & Poor's downgraded Areva’s debt rating to BBB+ due to weakened profitability.
In 2010, Trevor Findlay from the Centre for International Governance Innovation
stated that "despite some powerful drivers and clear advantages, a
revival of nuclear energy faces too many barriers compared to other
means of generating electricity for it to capture a growing market share
to 2030".
In January 2010, the International Solar Energy Society
stated that "... it appears that the pace of nuclear plant retirements
will exceed the development of the few new plants now being
contemplated, so that nuclear power may soon start on a downward trend.
It will remain to be seen if it has any place in an affordable future
world energy policy".
In March 2010, Steve Kidd from the World Nuclear Association
said: "Proof of whether the mooted nuclear renaissance is merely
'industry hype' as some commentators suggest or reality will come over
the next decade".
In 2013 Kidd characterised the situation as a nuclear slowdown,
requiring the industry to focus on better economics and improving public
acceptance.
In August 2010, physicist Michael Dittmar stated that: "Nuclear
fission's contribution to total electric energy has decreased from about
18 per cent a decade ago to about 14 per cent in 2008. On a worldwide
scale, nuclear energy is thus only a small component of the global
energy mix and its share, contrary to widespread belief, is not on the
rise".
In March 2011, Alexander Glaser said: "It will take time to grasp
the full impact of the unimaginable human tragedy unfolding after the earthquake and tsunami in Japan, but it is already clear that the proposition of a global nuclear renaissance ended on that day".
In 2011, Benjamin K. Sovacool
said: "The nuclear waste issue, although often ignored in industry
press releases and sponsored reports, is the proverbial elephant in the
room stopping a nuclear renaissance".